09 | 2019 Completion of the project | Inauguration

Eder waterfront park | Frankenberg (Eder)

On 28.09.2019, the Eder waterfront-fest took place in Frankenberg (Eder) to celebrate the inauguration of the Eder waterfront park. Among other design principles, this project incorporates the restoration and the environmental support of the stream Nemphe. Photography: © GTL


08 | 2019 Competiton

Deutsch-Deutsches Museum | Mödlareuth

4th Prize | In collaboration with Gunther Benkert architect and Babler + Lodde architects

Mödlareuth is an authentic living symbol of the German division, as this partition is still present today in both appearance and structure. The wall that ensured a consistent division between east and west is still partly present and legible in the village image – They are history’s footprint. The open space concept aims to highlight this footprint, in both the village and the landscape context, to connect it with the new museum building. It shall be accessible and usable through the different levels catered for both visitors and villagers alike. Visualization: © GTL, Benkert Schäfer Architekten Partnerschaft mbB, Babler+Lodde Architekten

More Information


08 | 2019 Competition

Marienplatz | Darmstadt

1st Prize | In collaboration with Netzwerkarchitekten GmbH

The landscape on the north and south of the building differs significantly.
In the north, an urban character is shaped along the building, further materialized through a uniform pavement and modern furniture. Visualization: © GTL, Netzwerkarchitekten GmbH

More Information


04 | 2019 Competition

Lecture Hall and Event Center | Bremen

3rd Prize | In collaboration with pfp Planungs GmbH

The competition included the design of a new building located at the heart of the University of Bremen. It is intended to be used as a lecture hall and an event center. The main access point is through the boulevard and the street level via vertical foyer galleries and a wide staircase. The architecture and landscape interplay forms a strong and vibrant central hub. Visualization: © GTL, pfp

More Information


06 | 2018 GTL

Continuing professional education

In June the office went on a four-day continuing professional education excursion to Marseille. The purpose of the trip was to study Mediterranean vegetation, as well as local building projects. During these exciting and eventful days in the area we enhanced our knowledge of the south of France.  Photography: © GTL

More photos


05 | 2020 Project

Completion of Königsstraße in Kassel

The construction phase of the Königsstraße has now been finalized with the tree planting on Friedrichsplatz and the furnishing of seating areas and bicycle stands. The redesign of the entire Königsstraße, which began six years ago, is now officially complete. The pedestrian zone is accentuated in the new image as its quality of stay and user-friendliness has vastly improved.
Photo: © GTL

More Information


09 | 2018 Competition

Hotel at Lake Titisee | Saveris on the Lake

1st Prize | In collaboration with Franken Architekten GmbH

Here the external landscaping has been adapted in response to the local building tradition. Regional fruit tree varieties and the deciduous trees typical of the Black Forest are elements that link in with the existing landscape. Retaining walls and paved surfaces are made of traditionally used local materials, underlining the connection with the region. Visualization: © Franken Architekten

More Information


09 | 2018 Competition

New building dormitory BGZ Simmerath | Aachen

1st Prize | In collaboration with HKS Architekten GmbH

With the traditional architecture the continuation of landscape has been provided by green car parking surfaces and linear tree design on the east side of the area. Site plan: © GTL

More Information


09 | 2018 Competition

Luisenhöfe | Aachen

1st Prize | In collaboration with Hector3

The scheme take up existing urban imprint and further extends it. The main access route spans from Mariabrunnstrasse towards the bunker. The resulting urban arrangement is formed by the space between the Werkshof and the Kastanienhof. There will be a transition between public and semi-private space.
The residential buildings will be accessed via the public roads. This arrangement results in protected and private spaces that will encourage people to spend time there.
An urban scheme is emerging that will be easily recognisable, with its own distinctive character within the neighbourhood.

More Information


08 | 2018 Completion

Pedestrian Zone, Obere Königsstraße Kassel

Completion of the first section

In a record time of seven weeks the first construction phase has been completed, ahead of the new school term. The work involved replacing the tramlines and repaving the area.
Special thanks are due to all those who helped to plan and implement this project in the Obere Königstrasse so speedily. | Photography: © GTL