05 | 2022 AWARD
Otto-Borst Prize 2022
We are proud to announce that our project "Redesign of the harbor environment" in Bad Karlshafen was awarded the Otto-Borst Prize 2022 by the International Network of Historic Cities during the international city conference of the Forum Stadt in Meran. The award was given to the city of Bad Karlshafen as the developer and the planning offices GTL/ Michael Triebswetter (Kassel) and Oppermann GmbH (Vellmar) with the special prize in the category of open space design. A total of 23 entries from Germany, Austria and Switzerland were submitted to the jury.
11 | 2021 Project
Completion of Fire department Titz
Update
In 2019, the construction of the new fire department and building yard building and the adjacent open spaces in the municipality of Titz was started with the laying of the foundation stone. This year, the building and its open spaces could be completed and inaugurated in september. Now the entrance to Titz is marked by an elongated building with a red-orange shiny facade.
The open spaces are mainly used for parking and turning facilities for the fire department and the building yard. The large areas of concrete block paving and asphalt are complemented by tree and shrub plantings along the perimeter of the site and bulk storage boxes to the north of the site. The tree planting is composed of preservation of existing trees as well as new plantings. ©GTL
12 | 2021 Project
Campeon – Infineon, Munich
Inspection
In this construction project, a complete small town was designed between 2001 and 2005, offering an office world for 7000 employees in the middle of a green meadow. Infineon's buildings are integrated into this spacious park with campus facilities. For the planting a mix of different high and low perennials and grasses was chosen, which are also beautiful in winter. ©GTL
12 | 2021 Project
State Garden Show Höxter 2023
Update
Construction of the Höxter 2023 State Garden Show, which we are working on together with Franz Reschke Landschaftsarchitektur GmbH, has begun. The first construction phases, including the design of the Weser promenade with landscape floe and the planting of the old tree-lined ramparts, are currently being implemented. Next year, the new history park in the Weserbogen and the Remtergarten in the direct vicinity of the world heritage site 'Carolingian Westwerk and Civitas Corvey' will follow. ©GTL
01 | 2022 COMPETITION
Residential district Blasius-Blick, Kaufbeuren
1st Price
The new "Blasius-Blick" residential quarter - attractive, local and climate-friendly.
The urban structure is based on the curved course of the floodplain along the future renaturalized Märzenbach stream and, in addition to the special building structure, creates attractive open spaces with local character. The outdoor spaces offer a variety of uses. In addition to functionality, a balance between private and public space is created throughout the neighborhood. ©GTL
07 | 2022 PROJECT
Orchard Bergpark Wilhelmshöhe, Kassel
Start of construction
On the Brandt-Stoph-Platz, an orchard based on a historical model is being created in the course of the new construction of the garden depot. The parking lot will be remodeled in this construction project and provided with a tree grid of fruit trees with old varieties from the 17th century to the 19th century, as well as forward-looking breeds. ©GTL
10 | 2022 PROJECT
REWE Green Market Wiesbaden
Update
One year after the opening of Rewe's new pilot store in Wiesbaden-Erbenheim the mixed perennial planting shines. When selecting the plants, attention was paid to drought tolerance, extensive care and a long flowering period. In addition to the striking architecture, the perennial planting is a special eye-catcher. ©GTL
10 | 2022 PROJECT
Poststraße Helmarshausen
Surcharge
We are pleased about the assignment together with the Oppermann engineering office to redesign the through road in Helmarshausen. After we prepared the feasibility study in 2021, we were now able to use the VgV procedure prevail against the competition and look forward to the implementation. ©GTL
01 | 2022 PROJECT
Monheimer Tor, Monheim
Topping-out ceremony
The existing shopping center in Monheim, the Monheimer Tor, is supplemented and enlarged by an extensive new building. GTL is responsible for the planning of the roof and interior greening. On 21.01.2022 the new building was inaugurated by a public topping-out ceremony.
During a speech, among others by the building owner, the topping-out tree was raised and the building was then consecrated with the traditional topping-out ceremony by the carpenter. This celebration marks a successfully completed milestone on the road to completion in 2024. ©GTL
12 | 2021 COMPETITION
Millennium Areal Frankfurt
Recognition
In the international realization competition, together with the architects schneider+ schumacher, we received recognition for our contribution. The development of the Millennium Areal in Frankfurt and the extension by two high-rise buildings with mixed use shall shape the skyline in a sustainable, resource-saving and climate-friendly way.
The building ensemble complementing Tower185 integrates offices, a hotel, apartments, stores, gastronomy and a kindergarten. The outdoor space is divided into a forecourt with a fountain and groves of trees, inner courtyards and a kindergarten play area. ©GTL