SMA Solar Technology AG Building 60 – 65 Dresdener Straße

Niestetal

Client: SMA Solar Technology AG
Cost: ca. 1.400.000 Euro
Area: 15.000 sqm
Service Phases: Lph 1-3
Duration: 2010 – 2012
In collaboration with: HHS Planer + Architekten AG, Kassel

The project incorporates the open space design along the Dresdener Straße, which grasps the buildings 60-65. Around the renovated old building SMA 62, a new landscape reception area is being built for the new principle building SMA 61. The designed space is divided into a spacious plaza with a seating island, a bypass, and a garden at the refurbished old building. Twin buildings 64/65 share a courtyard that splits into a reception and an outside seating area for the cafeteria. A hedge labyrinth separates the areas and simultaneously offers opportunities for retreat.

The outdoor concept adopts identifiable elements that underline the corporate identity, recurrent at all SMA locations.

Download Datasheet | PDF