07 | 2024 Project
Multifunctional building Heilbronn
Completion
The entrance courtyard to the office building and the hall will have a uniform concrete paving slab covering with a slight play of colors. There is a gate in the middle between the buildings. The building façade is flanked by hornbeam columns and simultaneously expanding planting areas.
The “green staircase” provides a visual link between the office building and the hall. It is the main connection to the spacious green roof area with subsequent access to the parking garage. The staircase is given an inviting character by seating steps with wooden supports, horizontal tree locations intercepted by retaining walls with underplanting, a varied, swiveling pedestrian route and other lingering niches.
The green roof area is planted with umbrella-shaped overhanging solitary trees and a varied planting of grasses/perennials and shrubs. There are two terrace areas that serve as a place for staff to spend time during breaks.
© Constantin Meyer